What this work involves
Assess cracks, falls, junctions and balustrade fixings. Coordinate with building management where elements are shared.
- Structural condition
- Waterproofing and floor finish
- Balustrades and drainage
Use the following design considerations when coordinating this service with a wider project. Agree which parts apply to your request.
Let outdoor routes accommodate anticipated changes in everyday use.
What the drawing needs to explain
Draw two uses within the same floor plan. Mark walls, doors and connections that stay unchanged and identify the alteration actually needed later.
Allow for later maintenance
Keep drawings of unused provisions too. Distinguish items merely prepared from those already connected and assessed.
Cost factors for this service
Costs depend on damage extent, access, structure and finishes. Ask for the scope and selected specification to be described separately.
Bring this to the discussion
Photographs of the existing situation, available drawings and your requirements for balcony & access-deck refurbishment. Identify the elements that should remain.
Questions about the work
What should I discuss before arranging balcony & access-deck refurbishment?
A new coating will not repair a weakened structure. Establish which building defects need attention first.
The design situations here illustrate choices; they are not completed projects or a diagnosis of your property.

