Pipework, insulation and structural junctions may become inaccessible after finishing. Plan checks before closing walls, floors or ceilings.
Decide this before construction
Choose the current layout first, then assess targeted preparation for later. Record which provisions are installed now and how they remain identifiable and accessible.
Identify concealed items
Focus on parts important for performance, maintenance and the agreed result. The aim is useful checks rather than a large unstructured photo collection.
How to review the result
Check the agreed current use fully. Then review preparatory provisions so future options are documented rather than left as a general promise.
Allow for later maintenance
Keep drawings of unused provisions too. Distinguish items merely prepared from those already connected and assessed.
Questions for your own property
- What will become hidden?
- Who checks it and when?
- Can photograph locations be identified?