Handover compares the completed work with the agreement. Prepare a room-by-room and element-by-element review.
How to review the result
Check the agreed current use fully. Then review preparatory provisions so future options are documented rather than left as a general promise.
Use the agreed scope
Bring proposals, drawings and recorded changes. Check the described work, visible finishing and operation.
What the drawing needs to explain
Draw two uses within the same floor plan. Mark walls, doors and connections that stay unchanged and identify the alteration actually needed later.
Allow for later maintenance
Keep drawings of unused provisions too. Distinguish items merely prepared from those already connected and assessed.
Questions for your own property
- Are changes included?
- Is each item clearly located?
- Are instructions and care records available?
Illustrative design situations, not evidence of completed work. Assess decisions against the actual property.